Drawbridge open again |
Drawbridge open again |
Jul 26 2021, 03:08 PM
Post
#1
|
|
Spends WAY too much time at CBTL Group: Admin Posts: 16,421 Joined: 8-December 06 From: Michigan City, IN Member No.: 2 |
https://hometownnewsnow.com/local-news/5829...xRkuPh1ZI2zqzEE
QUOTE The draw bridge in Michigan City was stuck open yesterday when the beach was packed from the hot and humid conditions. La Porte County Commissioner Rich Mrozinski said Marquiss Electric was there in ten minutes and soon had the bridge working again. The LaPorte County electric contractor was recently awarded a no-bid contract to do some permanent emergency repairs on the historic bridge during the winter. |
Lo-Fi Version | Time is now: 17th April 2024 - 09:40 PM |
Skin Designed By: neo at www.neonetweb.com