http://www.nwitimes.com/news/local/laporte...6d26fe08c7.html

QUOTE

Future of Michigan City draw bridge in doubt
Stan Maddux Times Correspondent

MICHIGAN CITY | For more than 80 years, the main entrance to Michigan City's lakefront has been controlled by a draw bridge that stops traffic when raised to let sailboats with their tall masts pass.

But the future of the draw bridge on Franklin Street is now in doubt.

LaPorte County commissioners have ordered an engineering study to determine if a stationary bridge would be more feasible.

The current bridge, which is owned by LaPorte County, is becoming costly to maintain, officials say. A stationary bridge would allow traffic to and from the lake to keep flowing instead of backing up when the bridge is raised.

"It's a study. We don't know what's going to come of it," Commissioner Dave Decker said.

Commissioners last month voted to allocate $1.5 million to replace worn gears and other parts, sand off rust and repaint the bridge.

The goal was to complete the renovation before the 2014 boating season.

That plan has changed, and Decker now says the restoration might be done over a three- to five-year period. The draw bridge will continue to operate while engineers come up with a plan for a stationary bridge and erect it, if commissioners decide to replace the draw bridge.

"There is some work that needs to be done immediately," Decker said.

The trick will be to design a stationary bridge high enough for sailboats to pass beneath, but not too steep for vehicle traffic.

That could be a challenge because of the short distance from Trail Creek to Washington Park and might require a slight change in location.

"It's going to have to be put off to the side and swung in there," Decker said.

Michigan City Mayor Ron Meer said he wants to look at the design of the fixed bridge and determine what impact it might have on the ongoing revitalization of the downtown before deciding whether he's for or against it.

"I want to see how it affects that whole area on the north end. A stationary bridge, to get the proper heights off the water, it's going to have to be a tall bridge," Meer said.

He's also concerned a stationary bridge would result in a whole new entrance to the lakefront and whether that would deter traffic away from attractions such as the Washington Park Zoo.

"I would have to start to see some drawings and engineering work before I make any really sound opinion on it," Meer said.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
ChickenCityRoller
post Sep 3 2013, 02:12 PM
Post #2


Really Comfortable
*****

Group: Members
Posts: 1,099
Joined: 11-January 07
Member No.: 19



I hope they keep the old bridge.


Signature Bar
IPB Image
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
ChickenCityRoller
post Sep 3 2013, 02:13 PM
Post #3


Really Comfortable
*****

Group: Members
Posts: 1,099
Joined: 11-January 07
Member No.: 19



Of course M.C. knows how to get a new bridge if they really want one

http://www.emichigancity.com/history/bridge-wreck.htm


Signature Bar
IPB Image
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
mcstumper
post Sep 3 2013, 06:10 PM
Post #4


Advanced Member
****

Group: Members
Posts: 459
Joined: 4-April 07
Member No.: 182



This has to be one of the most absurd things I have read in a while. Lets talk grade. The US 12 bridge grade begins at Michigan Blvd and peaks over Trail Creek 975 feet later. If a Franklin St. bridge started at the Amtrak tracks, it would be have only 450 feet to reach the same height. They could start the grade further south, say at 2nd street, but now the bridge would have to elevate over both the Amtrak tracks and Trail Creek. They would then have to figure out how to build an additional road to give access to the Trail Creek condos and Matey's.

From the north approach, you would need to start the grade at the Park ENTRANCE Road (east of the B&E entrance) to give yourself 950 feet to the center of Trail Creek. Imagine this long snaking bridge running between the creek and the beach.

Somehow in their minds this would be cheaper than maintaining the drawbridge. Michigan City residents have recently spoken out against a similar idea that would have also scarred the aesthetics of the Trail Creek/Lake Front area - that being the South Shore north-end realignment option. What on earth makes them believe we would let this fly?


Signature Bar
Put simply, mean reversion is a bitch. -Vitaliy Katsenelson
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
Southsider2k12
post Sep 3 2013, 07:11 PM
Post #5


Spends WAY too much time at CBTL
******

Group: Admin
Posts: 16,425
Joined: 8-December 06
From: Michigan City, IN
Member No.: 2



QUOTE(mcstumper @ Sep 3 2013, 07:10 PM) *

This has to be one of the most absurd things I have read in a while. Lets talk grade. The US 12 bridge grade begins at Michigan Blvd and peaks over Trail Creek 975 feet later. If a Franklin St. bridge started at the Amtrak tracks, it would be have only 450 feet to reach the same height. They could start the grade further south, say at 2nd street, but now the bridge would have to elevate over both the Amtrak tracks and Trail Creek. They would then have to figure out how to build an additional road to give access to the Trail Creek condos and Matey's.

From the north approach, you would need to start the grade at the Park ENTRANCE Road (east of the B&E entrance) to give yourself 950 feet to the center of Trail Creek. Imagine this long snaking bridge running between the creek and the beach.

Somehow in their minds this would be cheaper than maintaining the drawbridge. Michigan City residents have recently spoken out against a similar idea that would have also scarred the aesthetics of the Trail Creek/Lake Front area - that being the South Shore north-end realignment option. What on earth makes them believe we would let this fly?


Now we know why they bought the ND building... ph34r.gif
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
Ang
post Sep 4 2013, 08:38 AM
Post #6


Spends WAY too much time at CBTL
******

Group: Admin
Posts: 5,171
Joined: 11-December 06
From: Indiana
Member No.: 10



Good news is the Mayor is very reluctant to rubber stamp this project. According to the report on WEFM, he wants to see many proposals before he's even willing to consider this.


Signature Bar
Be who you are and say what you feel because those who mind don't matter and those who matter don't mind~Dr. Suess
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
Southsider2k12
post Sep 5 2013, 01:42 PM
Post #7


Spends WAY too much time at CBTL
******

Group: Admin
Posts: 16,425
Joined: 8-December 06
From: Michigan City, IN
Member No.: 2



QUOTE(Ang @ Sep 4 2013, 09:38 AM) *

Good news is the Mayor is very reluctant to rubber stamp this project. According to the report on WEFM, he wants to see many proposals before he's even willing to consider this.


Hopefully there is a way to fix the drawbridge, I know it is more expensive on an annual basis, but the character of the area would be ruined by a large span bridge.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 25th April 2024 - 04:24 PM

Skin Designed By: neo at www.neonetweb.com